Eurus Wind Farm

16°32′25″N 94°57′14″W / 16.54028°N 94.95389°W / 16.54028; -94.95389StatusOperationalConstruction costUS$550 millionWind farm TypeOnshorePower generation Units operational167Nameplate capacity250.5 MW
[edit on Wikidata]

The Eurus Wind Farm is a wind farm located in Juchitán de Zaragoza, Oaxaca, Mexico. The largest wind farm in Latin America, the partnership between Cemex and Acciona Energia cost US$550 million to build. Its 167 wind turbines combine to generate 250.5 megawatts (MW), sufficient power to supply about half a million people. By contrast with traditional means of power, it may reduce annual carbon dioxide emissions by 600,000 metric tons.[1][2][3]

See also

  • flagMexico portal
  • iconWeather portal
  • iconRenewable energy portal

References

  1. ^ Acciona Completes Assembly of LatAm’s Largest Wind Farm Archived 2012-03-02 at the Wayback Machine Latin American Herald Tribune.
  2. ^ CEMEX announces completion of EURUS wind farm construction, 23 November 2009
  3. ^ First Phase of 250-MW Eurus Wind Farm, 30 January 2009
  • v
  • t
  • e
Wind power
Wind power
Wind farms
Wind turbines
Wind power industry
Manufacturers
Concepts
  • icon Wind power portal
  • Category
  • Commons
  • Additional portals:
  • Renewable energy
  • Energy