Waverly Wind Farm

38°19′55″N 95°35′29″W / 38.33184°N 95.59138°W / 38.33184; -95.59138StatusOperationalConstruction beganAugust 2014Commission date2016Owner(s)EDP RenewablesEmployees19[1]Wind farm TypeOnshoreHub height305 ft (93 m)[2]Power generation Units operational95[1]Nameplate capacity199 MW[1]
[edit on Wikidata]

The Waverly Wind Farm is a wind powered electricity generation project in Kansas owned and operated by EDP Renewables. This site is located near Waverly, in Coffey County. The wind farm consists of 95 wind turbines over 25 square miles, generating up to 199 MW.[2]

It consists of 90 Siemens Gamesa 2.1MW and 5 Gamesa 2MW turbines.[1]

See also

References

  1. ^ a b c d "Waverly Wind Farm, Coffey County, Kansas" (PDF). 6 October 2021. Retrieved 18 December 2021.
  2. ^ a b "Wind turbines transforming southern horizon | Osage County Herald-Chronicle". Archived from the original on 4 September 2019. Retrieved 18 December 2021.

External links

  • "Waverly Wind Farm". EDP Renewables. Retrieved 18 December 2021.
  • Wind energy booming in Kansas
  • Waverly Wind Farm celebrates fifth birthday as Energy Efficiency Day winds down